Completed in six months, this fast-tracked project added a new reception area, offices, a staff library and many other staff comforts to the Bryan LGH East Campus Clinical Lab. The new lab area has many conviences, such as: rubber floors, new blood draw rooms, blood bank, walk-in refrigerator, large chemistry (lab) area, and a Grossing room with new equipment.
In November 2010, BryanLGH East debuted its new location of the Campus Clinical Lab. The 9,600 SF renovation, included a new reception area, new office area containing ten new offices, locker room, staff lounge, and library, as well as two new staff restrooms with a shower. The new lab area with rubber floor contains new blood draw rooms, blood bank, new walk-in refrigerator, large chemistry (lab) area, new Grossing room with new Grossing equipment. New electrical, HVAC, and plumping were added with a new acid waste neutralization tank.