A key component of this project was coordinating efforts with the Civic Center's events that continued throughout construction.
This 100,000 SF addition and 13,000 SF remodel was completed in 21 months. The addition and remodel included: site work, engineered fill; concrete grade beams, floors, and sidewalks; CMU and brick masonry; precast concrete stadia, structural steel; bar joists; steel decking; EIFS; membrane roofing; steel stud framing; drywall; painting; ACT ceilings; aluminum storefront; wood doors; hollow metal; carpet; athletic flooring; ceramic tile; ice making equipment; arena seating; and electrical and mechanical work.