SOUTHSIDE TERRACE FIREMAN TRAINING

At our Southside Terrace project, progress goes beyond construction, it’s about community impact.

This redevelopment includes the demolition of 16 existing buildings and the ground-up construction of 20 new buildings, bringing 113 much-needed residential housing units to the area.

In partnership with the Omaha Fire Department, our team is providing space at Southside Terrace for hands-on recruit training. Utilizing the existing structures, firefighters are gaining real-world experience through roof-cutting demonstrations and tactical exercises. It’s a strong example of how collaboration can strengthen both our communities and those who serve them.
 

Exceeding Expectations

At Sampson Construction, our in-house team of experts help drive mentoring and high performance. This extraordinary level of teamwork and pride spans generations. Our clients feel the impact at the jobsite throughout every stage of the project. Our culture is driven by quality, experience and commitment.

Left
Color: 
Blue