- PROJECT LOCATIONS

Sampson completed a 9,500 SF Addition to the Wisner Pilger Early Childhood Development Center, attached to their existing school. The building accommodates kids ages 2-4 and features four 1,000 SF classrooms, and a 1,100 SF multipurpose gymnasium separating the two groups of classrooms. Each classroom utilizes a shared restroom. The building also features a large book nook area with large storefront windows and a built-in wood/concrete bench. The addition has its own mechanical janitor, laundry, storage and break rooms. The finishes inside the facility match the finishes in the existing school.